Shutdown season crews for Sydney sites

The end-of-year shutdown is won or lost in the planning weeks. Score how ready you are, work out your lock-by dates and see which NSW public holidays change your labour bill. Then talk to a crew that is trade-tested and inducted before day one.

  • Two-minute readiness score
  • Lock-by date planner
  • NSW public holiday dates

No email needed. Nothing you enter leaves your browser.

Why the planning weeks decide the shutdown

A shutdown has a fixed window and a fixed list of work. What it never has is slack. If the crew is not locked, the tickets are not mapped and the inductions are not booked, the first days of the window go on problems the plan should have solved weeks earlier.

We use a simple rule of thumb with maintenance managers. Lock the trade mix about six weeks out. Book tickets and inductions about four weeks out. Agree rosters and fatigue limits about three weeks out. Confirm the standby crew, the permit packs and long-lead parts about two weeks out. It is our planning guide, not a regulation. Your site's own lead times come first.

Inside six weeks is not the end of the world. Your options narrow and the trade-offs get dearer, but a crew can still be built. Use the score and the planner below to see where you stand, then fix the lowest answers first.

At a glance

NSW public holidays that fall inside the season

Public holiday work is paid at a premium under most awards and agreements. Check these dates against your window before you set the budget.

Christmas DayFri 25 Dec 20261Public holiday
Boxing DaySat 26 Dec 20261Public holiday
Additional public holidayMon 28 Dec 20261Because Boxing Day falls on a Saturday
New Year's DayFri 1 Jan 20271Public holiday
Australia DayTue 26 Jan 20271Public holiday
Manufacturing Award public holiday rate250%2Ordinary hours, full-time employee, including the C10 tradesperson level. See the pay guide for current rates

Minimums under one award. Casual rates differ, and your site agreement or enterprise agreement may pay more. This is not a quote.

Self-check

Shutdown readiness score

Ten questions every site and maintenance manager should be able to answer before a shutdown starts. Answer for the shutdown you are planning now. 'Partly' is a fine answer and so is 'not yet'.

  1. Scope, work packs and the critical path are signed off. Start and finish dates, the work list and the jobs that set the finish date. Late scope is the biggest cause of overrun.
  2. Pre-shutdown site walkdowns are done with your supervisors. Each work front walked, access, scaffolding, lifting points and hazards noted, and the findings fed into the plan.
  3. Your trade mix is confirmed and booked, by shift. Fitters, boilermakers, welders, pipe fitters, electricians, riggers, scaffolders and TAs, on days and on nights, locked in with your labour provider.
  4. Every role is mapped to the tickets it needs, and tickets are verified. Confined space, working at heights, high risk work licences, gas test, EWP, forklift. Checked at source, with expiry dates.
  5. Inductions, medicals and site access are complete before day one. Site inductions booked, pre-employment medicals and drug and alcohol tests done, access cards issued. Nobody inducting on the first morning.
  6. You have contingency for drop-outs and no-shows. A standby list or a buffer crew of around 10%, plus a provider who can backfill overnight.
  7. Isolations, permits and SWMS are ready, each with a named owner. Isolation lists, permit-to-work and safe work method statements per work front, not one pack for the whole shutdown.
  8. Long-lead parts, materials, cranes and hire gear are confirmed for delivery. Ordered, with delivery dates before the start. The crew waiting on a part is the most expensive crew on site.
  9. Rosters, fatigue limits and logistics are agreed. Shift lengths, days in a row, rest breaks, plus travel, accommodation and meals for out of area workers.
  10. Supervision and communication are set up for every shift. Leading hands and supervisors named, toolbox talks, shift handovers and an escalation contact on each side who answers the phone.
0 to 7 points: Red: do the basics this week
Several of the things that sink a shutdown are still open. Start with the three lowest answers: scope signed off, site walkdowns done and the trade mix booked by shift. If your window is under six weeks away, call us today and tell us the dates. We will tell you plainly what we can fill.
8 to 13 points: Amber: a few gaps to close
You have the bones of a plan. The usual gaps are verified tickets, inductions and a drop-out plan. Book inductions and medicals first, because capacity runs out. Then lock in a standby list.
14 to 17 points: Green with edges: nearly there
A good position. Revisit the questions you answered 'partly'. Contingency for no-shows and a named contact on each shift are the two things that save the first weekend.
18 and above points: Locked: ready to brief
You can brief a labour provider with real numbers. Send us the trade mix, the tickets and the dates and we will confirm what we can supply.
  1. 1Scope, work packs and the critical path are signed off.Start and finish dates, the work list and the jobs that set the finish date. Late scope is the biggest cause of overrun.
  2. 2Pre-shutdown site walkdowns are done with your supervisors.Each work front walked, access, scaffolding, lifting points and hazards noted, and the findings fed into the plan.
  3. 3Your trade mix is confirmed and booked, by shift.Fitters, boilermakers, welders, pipe fitters, electricians, riggers, scaffolders and TAs, on days and on nights, locked in with your labour provider.
  4. 4Every role is mapped to the tickets it needs, and tickets are verified.Confined space, working at heights, high risk work licences, gas test, EWP, forklift. Checked at source, with expiry dates.
  5. 5Inductions, medicals and site access are complete before day one.Site inductions booked, pre-employment medicals and drug and alcohol tests done, access cards issued. Nobody inducting on the first morning.
  6. 6You have contingency for drop-outs and no-shows.A standby list or a buffer crew of around 10%, plus a provider who can backfill overnight.
  7. 7Isolations, permits and SWMS are ready, each with a named owner.Isolation lists, permit-to-work and safe work method statements per work front, not one pack for the whole shutdown.
  8. 8Long-lead parts, materials, cranes and hire gear are confirmed for delivery.Ordered, with delivery dates before the start. The crew waiting on a part is the most expensive crew on site.
  9. 9Rosters, fatigue limits and logistics are agreed.Shift lengths, days in a row, rest breaks, plus travel, accommodation and meals for out of area workers.
  10. 10Supervision and communication are set up for every shift.Leading hands and supervisors named, toolbox talks, shift handovers and an escalation contact on each side who answers the phone.

This score is a conversation starter built from our planning experience. It is not an audit of your site, your safety system or your compliance.

Calculator

Lock-by planner

Enter your start date as weeks from today and the shape of the roster. The planner shows where each planning milestone sits against our rule of thumb.

Count from today to the first day of the window.

Everyone on site at once, across all trades.

Results at the inputs shown

Where you stand
On track. You are six or more weeks out.
Lock the trade mix
in 4 weeks

Our rule of thumb: six weeks before the start.

Book tickets and inductions
in 6 weeks

Four weeks before the start.

Agree rosters and fatigue limits
in 7 weeks

Three weeks before the start.

Confirm standby crew, permits and parts
in 8 weeks

Two weeks before the start.

Crew-hours to roster Estimate
1,600 hours

People on shift, times shifts a day, times hours, times days.

Minimum people on the roster Estimate
16

If the same people worked every day. Real rosters need more people to allow rest days.

Estimate only. These milestones are Smart Industrial's planning rule of thumb, not a regulation, and not a quote.

Assumptions

AssumptionValueNote
Lock the trade mix6 weeks before the start (our rule of thumb) Fixed
Book tickets and inductions4 weeks before the start (our rule of thumb) Fixed
Agree rosters and fatigue limits3 weeks before the start (our rule of thumb) Fixed
Confirm standby crew, permits and parts2 weeks before the start (our rule of thumb) Fixed

What the numbers leave out

  • The planner does not know your site's induction capacity, permit system or contractor lead times. Those can be longer.
  • Crew-hours and head count are sizing figures, not a roster. A real roster has to respect award or agreement hours and rest between shifts.

How it works

How we crew a shutdown

Seven steps, boring on purpose. You always know what happens next.

01

Brief us

Dates, trade mix by shift, tickets, site and shift pattern. Use the request form or call 02 7813 4761.

02

Terms sorted

Rates and terms agreed in writing before anyone starts.

03

Profiles in your inbox

Verified qualifications, tickets and experience for everyone we put forward.

04

Crew mobilised

You approve the people. Every worker is safety-inducted by Smart Industrial before they step on your site, then does yours.

05

Timesheets approved

Workers record their hours on your site. Your supervisor approves them.

06

Weekly invoice

Weekly invoices, auto-generated from your approved timesheets.

07

We check in

We check in with you during the shutdown, not only at the end.

Smart Industrial, what a fantastic service these guys offer. Very professional and very adaptable which suits our business requirements as our procedures can often change at the last minute. Very professional organisation and a quality team to deal with, no other service comes close to these guys 10/10.

★★★★★D.A. (DLA)22 March 2024Google review

Questions

Shutdown labour questions

How far ahead should I book shutdown labour?

As soon as you have a firm scope. Our rule of thumb is to lock the trade mix about six weeks before the start, book tickets and inductions about four weeks out and agree rosters about three weeks out. It is a planning guide, not a regulation, and your site's lead times come first. If you are inside six weeks, send us the dates and we will tell you honestly what we can fill.

Which trades does a shutdown usually need?

Most scopes call on mechanical fitters, boilermakers, pipe fitters and welders, electricians, riggers and dogmen, crane operators and trade assistants. The mix by shift matters more than the head count. Give us the work list and the shifts and we will match the crew. If you are unsure of the mix, describe the work and we will help you size it.

What tickets do shutdown crews usually need?

It depends on the tasks. Confined space entry, working at heights and high risk work licences such as dogging, rigging, EWP and crane classes come up most often, and many sites add their own inductions and permits. Map tickets to tasks early, because that map decides who you can use on which work front. We verify and record licences and tickets before a worker starts.

Do public holidays really change the cost?

Yes. Under the Manufacturing Award, ordinary hours worked on a public holiday are paid at 250% of the base rate for a full-time employee, including at the C10 tradesperson level.2 Weekend and overtime rates also apply, and the Fair Work Ombudsman pay guide sets out the current rates. Your site agreement may pay more. Five NSW public holiday dates fall between 25 December and 26 January this season.1

Can you supply a whole crew, inducted together?

We supply whole crews as well as single trades. Tell us the numbers, trades and dates and we will confirm what we can mobilise. Every worker is safety-inducted by Smart Industrial before they step on your site, with their visa (VEVO) check, National Police Check and pre-employment medical completed in-house. Your site induction then sits on top.

What if the scope grows mid-shutdown?

It happens. Tell us as early as you can, with the trade, the tickets and the shift. We will tell you what we can add and by when, and we will say so plainly if we cannot.

Do you supply regional shutdown crews?

We supply Sydney-wide and across NSW. Our team has provided ongoing support during maintenance shutdowns at Cadia Valley Operations. For regional work we agree travel, accommodation and rosters with you before anyone mobilises.

Sources and notes

  1. NSW Government: NSW public holidays. Dates for 2026 and 2027, including the additional holiday on Monday 28 December 2026. Accessed 3 October 2026.
  2. Fair Work Ombudsman: Pay Guide, Manufacturing and Associated Industries and Occupations Award [MA000010]. Effective from the first full pay period on or after 1 July 2026; published 29 July 2026. Public holiday rate of 250% of the base rate for full-time employees working ordinary hours. Accessed 3 October 2026.

Ready when you are

Tell us the dates, the trades and the tickets.

We will tell you honestly what we can fill, and when.